Difference between revisions of "January 25, 2018 DIRC"
From GlueXWiki
Line 24: | Line 24: | ||
#** Dates to discuss with SLAC | #** Dates to discuss with SLAC | ||
# Optical box | # Optical box | ||
− | #* Plan for engineering meetings (alternate Thursdays with this meeting) | + | #* Plan for engineering meetings (Bates+JLab alternate Thursdays with this meeting) |
#* Status update (Ernie and Jason) | #* Status update (Ernie and Jason) | ||
#** Box production at Lesker: final production drawings (?) | #** Box production at Lesker: final production drawings (?) |
Revision as of 09:23, 25 January 2018
Meeting Information
GlueX DIRC Meeting
Thursday January 25, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John, Tim, Tom)
- Roll fixture testing
- Bar box transportation
- Planning for final 3 bar boxes
- Crate shipment to IU and construction plans
- Dates to discuss with SLAC
- Planning for final 3 bar boxes
- Optical box
- Plan for engineering meetings (Bates+JLab alternate Thursdays with this meeting)
- Status update (Ernie and Jason)
- Box production at Lesker: final production drawings (?)
- PMT test fixture
- Other items and quotes
- Followup on questions to drawing package(?): STEP file
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill)
- AOB