Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"
From GlueXWiki
(→Sunday, February 25) |
(→Sunday, February 25) |
||
Line 79: | Line 79: | ||
#* CDC window: bring even closer to begining, narrow its width? | #* CDC window: bring even closer to begining, narrow its width? | ||
#* Revert to CDC integral mode: when? | #* Revert to CDC integral mode: when? | ||
− | #* | + | #* MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel. |
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
#* Harp scan in early morning | #* Harp scan in early morning |
Revision as of 22:29, 24 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, February 22
- Notes from the previous 24 hours:
- Continued production data until 1:30pm
- Secretary Perry toured Hall D
- Beam delivery shaky: Swing shift summary
- DAQ/cMesg/rootSPY issues
- Dipole trip
- Transmission looks ok
- Production data
- Issues:
- Harp scan EPICS screenshot
- FDC trips: issue on 1 channel; Beni lowered the bias.
- Large Y-oscillations in 511C
- Photon beam intensity anomaly
- Reports (?):
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan once beam returns
- Production data
Friday, February 23
- Notes from the previous 24 hours:
- Production data
- Beam taken away 11:15-14:14 for linac issues
- Owl Shift Summary: rho, omega, phi triggers
- Issues:
- ADC in slot 16 of the TOF crate is still commented out in the config file
- FDC TDC-ADC timing shifts
- Are these issues?: Problem starting run, ROCSTPSC2 and ROCTAGM2 have no events, Power cycle the ROCTRIG2 and Start the DAQ again, ROCFCAL3
- Reports (?):
- Planning:
- 100nA 10-4 radiator
- nA BPM commissioning: Rate dependence, Flux, Polarization
- Current timings, CDC and FDC timings
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan at 7am
- Production data
Saturday, February 24
- No Hall D Counting Room meeting due to Collaboration Meeting
Sunday, February 25
- Notes from the previous 24 hours:
- Production data
- CDC 160 ns shift, calibration, analysis
- Scan result for HALO
- Issues:
- FCAL pedestals re pi0 peak shifted
- rootspy causes log out of hdops
- 3min oscillations
- FDC TDC-ADC timing shifts
- TPOL sector 3?
- ADC in slot 16 of the TOF crate is commented out in the config file
- Reports:
- Hall D Cavity BPMs initial steps
- Beam position update
- AC x-response
- Planning:
- Move collimator+beam
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- CDC window: bring even closer to begining, narrow its width?
- Revert to CDC integral mode: when?
- MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning
- Production data
Monday, February 26
- Notes from the previous 24 hours:
Tuesday, February 27
- Notes from the previous 24 hours:
Wednesday, February 28
- Notes from the previous 24 hours: