Difference between revisions of "Run Planning Meeting Notes, Mar 1-Mar 7, 2018"
From GlueXWiki
(→Thursday, March 1-7) |
|||
Line 38: | Line 38: | ||
#* DAQ crashes at go (Sasha fixed it) ~40 mins banu [https://logbooks.jlab.org/entry/3540873, https://logbooks.jlab.org/entry/3540927] | #* DAQ crashes at go (Sasha fixed it) ~40 mins banu [https://logbooks.jlab.org/entry/3540873, https://logbooks.jlab.org/entry/3540927] | ||
#* downtime - issue with one of the cavities ~1.5h (2L15-4 dropping zone from HV; Cavity bypassed; still dropping zone. EES-RF contacted.) | #* downtime - issue with one of the cavities ~1.5h (2L15-4 dropping zone from HV; Cavity bypassed; still dropping zone. EES-RF contacted.) | ||
+ | #*FDC trips during owl shift [https://logbooks.jlab.org/entry/3541270] [SF, VC] | ||
# Reports | # Reports | ||
#* cdc rates during current scan 41343-41347 [https://logbooks.jlab.org/entry/3540987] [BZ] | #* cdc rates during current scan 41343-41347 [https://logbooks.jlab.org/entry/3540987] [BZ] | ||
#* low level monitoring [TB] | #* low level monitoring [TB] | ||
#* beam [AD] | #* beam [AD] | ||
+ | #* CDC pressure alarm [https://logbooks.jlab.org/entry/3541040] [CG] | ||
# Planning: | # Planning: | ||
#* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg] | #* updated run time chart [https://halldweb1.jlab.org/wiki/index.php/File:Spring18_week8.jpg] |
Revision as of 06:56, 2 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 1
- Notes from the previous 24 hours:
- MCC reports
- Production Data with 58um JD70-100 diamond in the early afternoon
- At about 6pm, we started low intensity scan as proposed in Justin's google sheet
- For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous current scan, (ii) We reverted to the previous value of the CDC window offset
- [Beam Position Strip Chart, AC, PS Coincidence Monitoring https://logbooks.jlab.org/entry/3540484] (small interruption from 9pm-10pm)
- Issues:
- Reports (some of these shown at the AWG yesterday):
- Planning:
- updated run time chart [9]
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
Thursday, March 2
- Notes from the previous 24 hours:
- Hall D low-current orbit lock test for TAC runs: succeeded in good horizontal orbit lock down to a few nA [13]
- Issues:
- DAQ crashes at go (Sasha fixed it) ~40 mins banu https://logbooks.jlab.org/entry/3540927
- downtime - issue with one of the cavities ~1.5h (2L15-4 dropping zone from HV; Cavity bypassed; still dropping zone. EES-RF contacted.)
- FDC trips during owl shift [14] [SF, VC]
- Reports
- Planning:
- updated run time chart [17]
- Today's run plan (TBD) Run Plan Google Calendar Accel. Run Plan Google Calendar:
- harp scan
- Sasha planning ~30 min run using the thicker 750 um thick converter after harp scan