Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"
From GlueXWiki
(→Friday, April 20 at 08:45) |
|||
Line 5: | Line 5: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Monday, April 22 at 08:45 == | ||
+ | # Notes from the weekend: | ||
+ | #* Production running | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3564054 Raster scan commissioning] Todd: "we are ready for a test with AC DAQ running" | ||
+ | #* [https://logbooks.jlab.org/entry/3563853 First collimator scan had issues], [https://logbooks.jlab.org/entry/3564074 Follow up more successful], [https://logbooks.jlab.org/entry/3564002 active target], [https://logbooks.jlab.org/entry/3564090 Total PS rate] | ||
+ | # Issues: | ||
+ | #* RCDB issues [https://logbooks.jlab.org/entry/3564038], | ||
+ | # Run Plan | ||
+ | #* High rate tests Monday | ||
+ | #* Production running | ||
+ | #* Longer term run plan | ||
+ | #** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan] | ||
+ | # AOB | ||
== Friday, April 20 at 08:45 == | == Friday, April 20 at 08:45 == |
Revision as of 14:14, 21 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Monday, April 22 at 08:45
- Notes from the weekend:
- Production running
- Reports:
- Raster scan commissioning Todd: "we are ready for a test with AC DAQ running"
- First collimator scan had issues, Follow up more successful, active target, Total PS rate
- Issues:
- RCDB issues [1],
- Run Plan
- High rate tests Monday
- Production running
- Longer term run plan
- AOB
Friday, April 20 at 08:45
- Notes from the previous 24 hours:
- Moved AC to 5 mm hole, installed 100 um W shield
- Production running
- Reports:
- Issues
- Run Plan
- High rate tests this afternoon
- Production running
- Fast raster scan deferred until Monday (probably, will hear from PD)
- Longer term run plan
- AOB
Thursday, April 19 at 08:45
- Notes from the previous 24 hours:
- Convergence was adjusted
- Current scan completed
- Production running
- Issues:
- Reports:
- Results from material scan (Sergey and Lubomir)
- Results from thin diamond, 3.4 mm hole. FDC currents drop, not CDC PS flux comparison PS enhancement increases
- First results from current scan [2] [3] [4]
- CDC current correlation with Y beam position observed again (Beni)
- Run Plan
- Access today to
- Move active collimator to 5 mm hole
- Attach Pb radiator to profiler
- Muon chamber inspection
- Production running
- Harp scan when beam comes back
- Fast raster scan deferred until the required people can be found
- Future studies
- Access today to
- AOB