* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Friday, April 27 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Production running | ||
+ | #Issues: | ||
+ | #* Running with 750 um converter | ||
+ | #* Raster Scan | ||
+ | # Reports: | ||
+ | # Run Plan | ||
+ | #*Friday | ||
+ | #**High rate DAQ tests (9.30 am) | ||
+ | #**TAC Run (2 pm) | ||
+ | #*Saturday | ||
+ | #**Production Running | ||
+ | #*Sunday | ||
+ | #**Production Running | ||
+ | #*Longer term run plan | ||
+ | #**Resumption of raster scan studies | ||
+ | #*End of run preparation | ||
+ | #**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6 | ||
+ | # AOB | ||
== Thursday, April 26 at 08:45 == | == Thursday, April 26 at 08:45 == |
Revision as of 09:56, 26 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Production running
- Issues:
- Running with 750 um converter
- Raster Scan
- Reports:
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- TAC Run (2 pm)
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan
- Resumption of raster scan studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [1]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB