Difference between revisions of "Photon beam pipe"
From GlueXWiki
Line 9: | Line 9: | ||
---- | ---- | ||
− | + | === Photon beamline between tagger and West Wall === | |
Sketch of the photon beamline between the tagger magnet and the West wall of the | Sketch of the photon beamline between the tagger magnet and the West wall of the | ||
tagger hall. | tagger hall. |
Revision as of 11:12, 9 June 2008
Machine interface Documents
Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc
Machine interface document draft 3 ICD_Accelerator-HallD_03.doc
Photon beamline between tagger and West Wall
Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall. File:Beamline-BSize Layout.TIF
The plans by the accelerator are summarized in their song-sheet. It can be found here
Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif