Difference between revisions of "BLTWG Meeting 01/09/2019"
From GlueXWiki
(Created page with "=== Organization === * Time: 11:30 EDT * JLab meeting room: A110, Hall D counting house * Connecting: detailed instructions are here **...") |
|||
Line 13: | Line 13: | ||
# TAGM fiber upgrade underway in Tagger Hall - ''Richard J.'' | # TAGM fiber upgrade underway in Tagger Hall - ''Richard J.'' | ||
# Beam monitoring issues | # Beam monitoring issues | ||
− | #* Update on TPOL polarization results from 2016-2017 - ''Michael D.'' | + | #* [https://userweb.jlab.org/~dugger/triPol/oldNewComp.pdf Update on TPOL polarization results from 2016-2017] - ''Michael D.'' |
#* Verifying systematics for energy deposition cuts in TPOL simulation - ''pending further work'' | #* Verifying systematics for energy deposition cuts in TPOL simulation - ''pending further work'' | ||
#* Systematics studies with 750um converter data, 2018 data | #* Systematics studies with 750um converter data, 2018 data |
Revision as of 11:56, 9 January 2019
Organization
- Time: 11:30 EDT
- JLab meeting room: A110, Hall D counting house
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
- Present:
Agenda
- Announcements
- TAGM fiber upgrade underway in Tagger Hall - Richard J.
- Beam monitoring issues
- Update on TPOL polarization results from 2016-2017 - Michael D.
- Verifying systematics for energy deposition cuts in TPOL simulation - pending further work
- Systematics studies with 750um converter data, 2018 data
- Update on hadronic asymmetries - Justin, Alexander
- TPOL readout at high rate - Sasha
- Beamline geometry changes in hdds - Richard J
- small geometry overlaps found in TPOL (support rails, target holders, not critical)
- larger overlaps found in PS vacuum chamber, beam pipe (not critical)
- overlap between target assembly and beam pipe (upstream of target, not critical)
- potentially more serious overlaps between BCAL and FDC (not relevant for this meeting)
- corrections to simulation geometry now pending on github
- Priority issues for next 3 months
- evaluation of beam flux systematic error (spectrum, normalization) - Justin, Sasha
- evaluation of polarization systematics (relative, absolute scale) - Michael Richard
- finishing the first round CBSA simulations (requested 9 months ago!) - Richard
- Upcoming activities
- removal/remounting of 5 virgin 50um diamonds
- CLS measurements (next run starting in January, experimental schedule pending)
- reconfiguration of the tagger for CPP - Richard
- Any other business