#* DIRC production data taking over night | #* DIRC production data taking over night | ||
# Issues | # Issues | ||
− | #*[https://logbooks.jlab.org/ | + | #* Current limited at 150 nA(diamond)/50nA(amo) due to DAQ problem. |
+ | #*[https://logbooks.jlab.org/files/2019/02/3651503/Screenshot%20from%202019-02-12%2001-52-42.png] ,[https://logbooks.jlab.org/files/2019/02/3651505/Screenshot%20from%202019-02-12%2001-55-41.png] DAQ lifetime dropped to zero multiple times | ||
#*TOF RF status? | #*TOF RF status? | ||
#*[https://halldweb.jlab.org/wiki/index.php/File:Energy_drift.jpg Beam current can drift by 10+ MeV]. Do we care? | #*[https://halldweb.jlab.org/wiki/index.php/File:Energy_drift.jpg Beam current can drift by 10+ MeV]. Do we care? |
Revision as of 08:37, 12 February 2019
Tuesday, Feb. 12 at 08:45
- Notes from the past 24 hours:
- Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl.
- PS thr. scan finalized.
- DIRC production data taking over night
- Issues
- Current limited at 150 nA(diamond)/50nA(amo) due to DAQ problem.
- [1] ,[2] DAQ lifetime dropped to zero multiple times
- TOF RF status?
- Beam current can drift by 10+ MeV. Do we care?
- Today's plan (changed this morning at the 8:00am MCC meeting)
Monday, Feb. 11 at 08:45
- Notes from the past 72 hours:
- Beam restoration, system checkout and start of DIRC commissioning going well.
- Issues
- Harp at 5C11, Harp at 5C11b, Hall D harp+ fit, Coherent peak as of this morning Beam convergences probably bad. Do we want to address this?
- [3], [4] DAQ lifetime sometimes drops]
- TOF RF status?
- DIRC Commissioning with beam over weekend:
- Today's plan (changed this morning at the 8:00am MCC meeting)
- 8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D
- 9:30am-??12:30pm-2:30pm?? RF recovery: No beam
- After RF recovery: spin dance for Hall B.
- Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between.
- Restart DIRC commissioning.
- MCC white board
- This week time chart
- Hall D white board