Difference between revisions of "March 5, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 17: | Line 17: | ||
# Announcements | # Announcements | ||
+ | # Summer installation planning: | ||
+ | #* Window for upper box being polished and frame order has been submitted | ||
+ | #* Plans for tests with LED fibers and canullas (Bill/Fernando) | ||
+ | #* Plans for making bar boxes light tight (All) | ||
# [[Spring 2019 DIRC Commissioning]] (All) | # [[Spring 2019 DIRC Commissioning]] (All) | ||
#* Status of REST file processing (dirc_monitoring/ver08) | #* Status of REST file processing (dirc_monitoring/ver08) | ||
− | #* LED data analysis and comparison to laser test stand data | + | #* LED data analysis and comparison to laser test stand data (Bill/Andrew) |
#* List of beam/detector conditions and studies planned | #* List of beam/detector conditions and studies planned | ||
− | #* | + | #* Plans for timing calibrations, etc. before next reconstruction pass over data |
# Software/simulations | # Software/simulations | ||
#* Implementing realistic efficiency/time resolution in MC (Justin) | #* Implementing realistic efficiency/time resolution in MC (Justin) |
Revision as of 12:15, 4 March 2019
Meeting Information
GlueX DIRC Meeting
Tuesday March 5, 2019
1:00 pm, EDT
JLab Hall D counting house
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Summer installation planning:
- Window for upper box being polished and frame order has been submitted
- Plans for tests with LED fibers and canullas (Bill/Fernando)
- Plans for making bar boxes light tight (All)
- Spring 2019 DIRC Commissioning (All)
- Status of REST file processing (dirc_monitoring/ver08)
- LED data analysis and comparison to laser test stand data (Bill/Andrew)
- List of beam/detector conditions and studies planned
- Plans for timing calibrations, etc. before next reconstruction pass over data
- Software/simulations
- Implementing realistic efficiency/time resolution in MC (Justin)
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- Adding # photons to LUT likelihood (Maria)
- Alignment updates (Cris)
- Requests for simulations: what samples, how much statistics, etc.?
- Software overview and tasks (All)
- AOB