Difference between revisions of "April 30, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday April 30, 2019<br> 1:00 pm, EDT<br> JLab F326 <br> == Connection Using Bluejeans == # To join via Polycom room syste...") |
|||
Line 21: | Line 21: | ||
#* Window for upper box (Ernie) | #* Window for upper box (Ernie) | ||
#* Ongoing ar box light tightness work (All) | #* Ongoing ar box light tightness work (All) | ||
− | #* Cookies update | + | #* Cookies update (Yunjie/Maria) |
#* Plans for tests with LED fibers and canullas (Bill/Fernando) | #* Plans for tests with LED fibers and canullas (Bill/Fernando) | ||
# [[Spring 2019 DIRC Commissioning]] (All) | # [[Spring 2019 DIRC Commissioning]] (All) | ||
− | #* Half of REST data processed with updated dirc_tree plugin. Disk failure prematurely ended the processing this past weekend | + | #* Half of REST data processed with updated dirc_tree plugin. Disk failure prematurely ended the processing this past weekend. (Roman/Ahmed/All) |
− | + | #* Next pass will begin shortly to finish processing the full dataset | |
− | #* | + | |
# Software/simulations | # Software/simulations | ||
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) |
Revision as of 16:59, 29 April 2019
Meeting Information
GlueX DIRC Meeting
Tuesday April 30, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration Meeting May 14-16, 2019 at Jefferson Lab.
- Summer installation planning:
- Window for upper box (Ernie)
- Ongoing ar box light tightness work (All)
- Cookies update (Yunjie/Maria)
- Plans for tests with LED fibers and canullas (Bill/Fernando)
- Spring 2019 DIRC Commissioning (All)
- Half of REST data processed with updated dirc_tree plugin. Disk failure prematurely ended the processing this past weekend. (Roman/Ahmed/All)
- Next pass will begin shortly to finish processing the full dataset
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB