Difference between revisions of "October 14, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 26: | Line 26: | ||
# LED diffuser Update (Bill) | # LED diffuser Update (Bill) | ||
# Readout tests (Justin, Bill, All) | # Readout tests (Justin, Bill, All) | ||
− | #* First tests | + | #* [https://logbooks.jlab.org/entry/3733993 First tests of North and South OB with pulser and LED] (Justin, Bill) |
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
#* New production [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2019-September/000458.html announcement e-mail] | #* New production [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2019-September/000458.html announcement e-mail] |
Revision as of 08:23, 10 October 2019
Meeting Information
GlueX DIRC Meeting
Monday October 14, 2019
1:00 pm, EDT
CC F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Mirror replacement update
- Full size gluing samples and water test (Tim, Keith)
- Thermal expansion tests (Tim, Bill, Keith)
- Mirror cutting at Danny's glass (Tim)
- Borosilicate procurement and delivery (Tim)
- North OB strongback delivery (Tim/Mark)
- Installation plan and timeline (All)
- Full size gluing samples and water test (Tim, Keith)
- LED diffuser Update (Bill)
- Readout tests (Justin, Bill, All)
- First tests of North and South OB with pulser and LED (Justin, Bill)
- Spring 2019 DIRC Commissioning Analysis (All)
- New production announcement e-mail
- Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
- New simulation samples
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Commissioning Analyses Update (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- New production announcement e-mail
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB