Difference between revisions of "Controls Meeting 17-Oct-2019"
From GlueXWiki
Line 6: | Line 6: | ||
* gluon cluster upgrades (Hovanes) | * gluon cluster upgrades (Hovanes) | ||
* Voltage controls changes (Hovanes) | * Voltage controls changes (Hovanes) | ||
− | *: [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]] | + | *: Noticed a problem : [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]] |
* ComCal installation/survey | * ComCal installation/survey | ||
* DIRC controls (Nick) | * DIRC controls (Nick) |
Revision as of 11:10, 15 October 2019
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Power up
- PXI
- Goniometer status
- gluon cluster upgrades (Hovanes)
- Voltage controls changes (Hovanes)
- Noticed a problem : CDC airflow interlock indicator green while CDC LV is interlocked
- ComCal installation/survey
- DIRC controls (Nick)
- Other business
Time/Location
10:00AM Thursday 17-Oct-2019 CC B101