Difference between revisions of "Controls Meeting 17-Oct-2019"
From GlueXWiki
Line 7: | Line 7: | ||
* Voltage controls changes (Hovanes) | * Voltage controls changes (Hovanes) | ||
*: Noticed a problem : [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]] | *: Noticed a problem : [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]] | ||
+ | *: [https://logbooks.jlab.org/entry/3734805 BCAL voltage issues] | ||
* ComCal installation/survey | * ComCal installation/survey | ||
* DIRC controls (Nick) | * DIRC controls (Nick) |
Revision as of 09:55, 17 October 2019
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Power up tests
- PXI
- Goniometer status
- gluon cluster upgrades (Hovanes)
- Voltage controls changes (Hovanes)
- Noticed a problem : CDC airflow interlock indicator green while CDC LV is interlocked
- BCAL voltage issues
- ComCal installation/survey
- DIRC controls (Nick)
- Other business
Time/Location
10:00AM Thursday 17-Oct-2019 CC B101