Difference between revisions of "Tagged Beam Group Engineering Drawings"
From GlueXWiki
Senderovich (Talk | contribs) (→Tagger Microscope) |
|||
Line 10: | Line 10: | ||
==Tagger Microscope== | ==Tagger Microscope== | ||
− | * | + | * [http://zeus.phys.uconn.edu/wiki/index.php?title=Tagger_Microscope_Mechanical_Design#CAD_Drawings Model and drawings produced by Univ. Connecticut] ''(5/2007)'' |
==Active Collimator== | ==Active Collimator== |
Revision as of 12:46, 3 September 2008
Contents
Tagging Spectrometer
- Conceptual drawings produced by the Glasgow group (ca. 2006)
- 35% drawings produced by the IHEP group (5/2007)
- Interface drawings produced at JLab (1/2008)
Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008 Tagger magnet and chamber section 2 July, 30, 2008 - July 30, 2008
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
Active Collimator
- 100% drawings produced by Univ. Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008