Difference between revisions of "Construction plan 1/1/2020 - 30/8/2020"
From GlueXWiki
Line 21: | Line 21: | ||
:: - Tool exists | :: - Tool exists | ||
:: - Time per module - 20 min | :: - Time per module - 20 min | ||
+ | |||
* Preparation of silicon cookie | * Preparation of silicon cookie |
Revision as of 19:22, 8 January 2020
The goal is to assemble 450 - 500 modules by the end of summer
- Brazing straps
- Procedure - brazing setup exists, has to be finalized
- Time per module - 30 min
- ESR shaping
- - ESR cutting (cutting tool exist)
- - Shaping in the oven (2 shaping tools exist, 30 min per cycle]
- Tedlar cutting
- - Tool exists
- - Time per module - 15 min
- Crystal wrapping
- - Tool exists
- - Time per module - 20 min
- Preparation of silicon cookie
- - Tool in preparation
- - Mix RTV
- -
- Module fabrication