Difference between revisions of "Tagged Beam Group Engineering Drawings"
From GlueXWiki
Senderovich (Talk | contribs) (→Active Collimator) |
|||
Line 5: | Line 5: | ||
[http://www.jlab.org/~whitey/TAGGER/TAGGER_section1.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008'' | [http://www.jlab.org/~whitey/TAGGER/TAGGER_section1.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008'' | ||
[http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008'' | [http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008'' | ||
+ | [http://www.jlab.org/~whitey/TAGGER/YANGNET.pdf Tagger magnet Cross section from Yang Tosca Sept 10, 2008] | ||
==Broadband Tagger Hodoscope== | ==Broadband Tagger Hodoscope== |
Revision as of 15:56, 10 September 2008
Contents
Tagging Spectrometer
- Conceptual drawings produced by the Glasgow group (ca. 2006)
- 35% drawings produced by the IHEP group (5/2007)
- Interface drawings produced at JLab (1/2008)
Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008 Tagger magnet and chamber section 2 July, 30, 2008 - July 30, 2008 Tagger magnet Cross section from Yang Tosca Sept 10, 2008
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
Active Collimator
- 100% drawings produced by Univ. of Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008