Difference between revisions of "Photon beam pipe"
From GlueXWiki
(→Construction and Installation Schedules) |
(→Construction and Installation Schedules) |
||
Line 51: | Line 51: | ||
[[Media:caveExtensionInstall.fts|Cave extension fasttrack file]] | [[Media:caveExtensionInstall.fts|Cave extension fasttrack file]] | ||
− | --- | + | ---- |
[http://www.jlab.org/Hall-D/software/wiki/index.php/Photon_Beam Return to Photon Beam Main Page] | [http://www.jlab.org/Hall-D/software/wiki/index.php/Photon_Beam Return to Photon Beam Main Page] | ||
[http://www.jlab.org/Hall-D/software/wiki/index.php/Main_Page Return to Hall-D WIKI main page] | [http://www.jlab.org/Hall-D/software/wiki/index.php/Main_Page Return to Hall-D WIKI main page] |
Revision as of 10:11, 16 September 2008
Contents
Machine interface Documents
Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc
Machine interface document draft 3 ICD_Accelerator-HallD_03.doc
Machine Group Songsheet for the Tagger Hall
The plans by the accelerator are summarized in their song-sheet. It can be found here
Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif
Tagger Hall Vacuum System
Tagger hall vacuum layout
Schematic overview of the tagger hall vacuum system
Photon beamline between tagger and West Wall
Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall.
File:Beamline-BSize Layout.TIF
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008