Difference between revisions of "Photon beam pipe"

From GlueXWiki
Jump to: navigation, search
(Construction and Installation Schedules)
(Construction and Installation Schedules)
Line 51: Line 51:
 
[[Media:caveExtensionInstall.fts|Cave extension fasttrack file]]
 
[[Media:caveExtensionInstall.fts|Cave extension fasttrack file]]
  
---
+
----
  
 
[http://www.jlab.org/Hall-D/software/wiki/index.php/Photon_Beam Return to Photon Beam Main Page]
 
[http://www.jlab.org/Hall-D/software/wiki/index.php/Photon_Beam Return to Photon Beam Main Page]
  
 
[http://www.jlab.org/Hall-D/software/wiki/index.php/Main_Page Return to Hall-D WIKI main page]
 
[http://www.jlab.org/Hall-D/software/wiki/index.php/Main_Page Return to Hall-D WIKI main page]

Revision as of 10:11, 16 September 2008

Machine interface Documents

Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc


Machine interface document draft 3 ICD_Accelerator-HallD_03.doc


Machine Group Songsheet for the Tagger Hall

The plans by the accelerator are summarized in their song-sheet. It can be found here

Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif



Tagger Hall Vacuum System

Tagger hall vacuum layout

Pumpstand.jpg
Schematic overview of the tagger hall vacuum system

Photon beamline between tagger and West Wall

Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall.

File:Beamline-BSize Layout.TIF




Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008


Construction and Installation Schedules

Installation schedule for the cave extension Cave extension fasttrack file


Return to Photon Beam Main Page

Return to Hall-D WIKI main page