Difference between revisions of "Run Planning Meeting Notes, July 27-August 5, 2020"
From GlueXWiki
m (→Aug. 3rd) |
|||
Line 66: | Line 66: | ||
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] | *[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] | ||
*Thursday: 1->5 pass change for Hall B. Hall A on-line. | *Thursday: 1->5 pass change for Hall B. Hall A on-line. | ||
+ | *Tuesday 11th: Maintenance day? | ||
+ | |||
+ | |||
+ | == Aug. 4th == | ||
+ | |||
+ | [https://logbooks.jlab.org/entry/3819971 Run plan for today] | ||
+ | |||
+ | Tasks completed: | ||
+ | *None: recovering from Isaias hurricane, with CEBAF going down on 08/03, ~2:30am | ||
+ | |||
+ | Tasks to be done: | ||
+ | *Hovanes to check JD70-105 diamond alignement | ||
+ | *Sacha finalized the trigger check out | ||
+ | *One production cycle at 150nA | ||
+ | *Start regular production. | ||
+ | |||
+ | Issues: | ||
+ | *[https://logbooks.jlab.org/entry/3820217 Instable beam current] (since the start of the run) | ||
+ | |||
+ | Reports: | ||
+ | *[https://logbooks.jlab.org/entry/3820433 leakage current test of active collimator] | ||
+ | Upcoming days: | ||
+ | *[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart] | ||
+ | *[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] | ||
+ | *Thursday?/Friday?: 1->5 pass change for Hall B. Hall A on-line. | ||
*Tuesday 11th: Maintenance day? | *Tuesday 11th: Maintenance day? |
Revision as of 22:58, 4 August 2020
<- Back to Run coordination meeting page
July 27th-Aug. 2nd
- Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
- Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
- Shift Started on Aug. 1st, 8am.
August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Did two long accesses to tagger, but the problem remains. Due to this, the runplan for August 3-4 has been reorganized
- CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.
- Radiation levels are good.
- Beam convergence is good
- Beam position optimized (?), however transmission doesn't appear to be optimal
- trigger checked out
- Radiation level study done.
- 15 min calibration runs (in long and production mode) done
- CDC HV scan ongoing.
Issues:
- TagM
- We often get less beam current than requested
- DAQ start run issue: reminder of DIRC mis-communication solution
- Difficulty in setting CDC HV for CDV HV scan, see also Keigo's entry. It was fixed by rebooting the IOC.
Upcoming days:
- Hurricane/tropical storm Isaias
- TagM communication issue
- Week 1 time chart
- Richard plan for Act. Col. test
- Thursday: 1->5 pass change for Hall B. Hall A on-line.
- Tuesday 11th: Maintenance day?
Aug. 3rd
Tasks completed:
- Took 1h "production" (with TagM down) amorphous run.
- Hovanes finalized the optimization of the transmission. Optimal transmission is obtained for:
- Profiler: X = - 1.8 Y = - 2.1
- AC: X = 0.8 Y = -0.4
- TagM fixed after 1:30pm-4:40-pm access. Sergey and Lubomir worked opportunistically in the Hall on TRD during Tagger access.
- Harp scan
- Short empty target run (cut short by CEBAF shutting down because of tornado alarm): run 72616, 56M events.
Tasks to be done:
- Hovanes to check JD70-105 diamond alignement
- Sacha finalized the trigger check out
- One production cycle at 150nA
- Start regular production.
Issues:
- Instable beam current (since the start of the run)
- Monitoring discrepancy: Hovanes observation, Naomi and Justin replies
- missing evio files
- Hurricane/tropical storm Isaias: CEBAF down and dropped to restricted access. Survey will not start until noon. Beam not expected until late swing.
Reports:
Upcoming days:
- Week 1 time chart
- Richard plan for Act. Col. test
- Thursday: 1->5 pass change for Hall B. Hall A on-line.
- Tuesday 11th: Maintenance day?
Aug. 4th
Tasks completed:
- None: recovering from Isaias hurricane, with CEBAF going down on 08/03, ~2:30am
Tasks to be done:
- Hovanes to check JD70-105 diamond alignement
- Sacha finalized the trigger check out
- One production cycle at 150nA
- Start regular production.
Issues:
- Instable beam current (since the start of the run)
Reports:
Upcoming days:
- Week 1 time chart
- Richard plan for Act. Col. test
- Thursday?/Friday?: 1->5 pass change for Hall B. Hall A on-line.
- Tuesday 11th: Maintenance day?