Difference between revisions of "Run Planning Meeting Notes, August 27-September 2, 2020"
From GlueXWiki
(→Wednesday, September 2) |
(→Wednesday, September 2) |
||
Line 16: | Line 16: | ||
# Last 24 hours: | # Last 24 hours: | ||
#* 6 am to 6 pm CPP de-installation, GEM/TRD installation | #* 6 am to 6 pm CPP de-installation, GEM/TRD installation | ||
− | #* Magnet ramping down starting at 3 pm and should be | + | #* Magnet ramping down starting at 3 pm and should be finished around 5:30 pm |
# Report/issues: | # Report/issues: | ||
#* [https://logbooks.jlab.org/entry/3839088 Ramp down wrongly initiated => stuck at 800 A] | #* [https://logbooks.jlab.org/entry/3839088 Ramp down wrongly initiated => stuck at 800 A] |
Revision as of 16:18, 1 September 2020
<- Back to Run Coordination Meetings:Summer2020
Contents
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Wednesday, September 2
- Last 24 hours:
- 6 am to 6 pm CPP de-installation, GEM/TRD installation
- Magnet ramping down starting at 3 pm and should be finished around 5:30 pm
- Report/issues:
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run plan
Tuesday, September 1
- Last 24 hours:
- CPP de-installation, GEM/TRD installation started at ~ 6 am
- 0.07956B triggers 0/90 PARA
- CPP test from ~ 8:45 pm up to ~ 6 am [1][2][3]
- CPP installation finished at ~ 5 pm, beam came back at ~ 8:45 pm
- Report/issues
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run plan
- 6 am to 6 pm CPP de-installation, GEM/TRD installation
- Ramp down the magnet
- Preliminary schedule for DIRC/GEM/TRD running: continues through noon Thursday
- 6 pm to 4 am, 10 hrs no-field run, 50nA on 10^-4 radiator.
- 4 am to 10 am, ramp up magnet
- Diamond alignment?
- TAC run?
- Rastering study?
Monday, August 31
- Last 72 hours:
- On Friday, we had no beam during the day until 8 pm
- 12B triggers: 5.56B PERP, 6.07B PARA, and 5.73 N/A (AMO)
- CPP test tasks 1 to 4
- Hall C requests 1/2 waveplate #1 IN
- Trigger/DAQ tests for the SRC/CT
- Report/issues
- Beam trip too often
- DIRC, change in configuration
- Crystal testing
- HARP scan
- FDC tripped without alarm again
- Beam energy increases by 6 MeV
- Tagger magnetic field was lowered by ~1% during run # 72934
- Rootspy, hydra not updating
- Evidence of Hall A bleed through
- hydra Status BCAL hot channel, has been like this for a while
- Unable to move coherent peak to low value
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run plan
Friday, August 28
- Last 24 hours:
- Report/issues
- DIRC, South Box Group 9 LV current draw
- CDC and FDC HV tripped
- BCAL pulser rebooted pulser test
- CPP test, task 1 to 4 not carry out because of beam down
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run plan
- Beam expected to come back around noon
- Hall access to debug DIRC (and change crystals?)
- Production
- CPP test - task 1 to 4 during Ilya's shift
Discussion on trigger/DAQ tests for the SRC/CT
- Sasha requested 5-6 hours on Sunday to do these tests
Discussion on CPP and GEM-TRD tests
- Restricted access on 31st, RADCOM sweep will start at 6 am
Media:CPP_GEM_Test_install_schedule_Aug2020.pdf
Thursday, August 27
- Last 24 hours:
- Due to Hall C current increase request, accelerator experimented with the optics => MCC recommended a HARP scan, 1st scan and 2nd scan
- Production
- Many short trips - beam stable for 5 min and then trips
- We lost 8hrs ie runs 72873 to 72876 cannot be used in analysis
- Report/issues:
- HARP scan - fit fails because of the beam trip, corrected by Hovanes
- CDC HV tripped twice: around 16:00 and around 22:00
- FDC HV tripped
- no HV alarms for CDC and FDC but problem visible on online monitoring plots and HydraRun saw it
- Hovanes reported a bug in the communication software which causes the alarm problems
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run Plan
- Production
- CPP test - task 1 to 4 during Ilya's shift
Discussion on trigger/DAQ tests for the SRC/CT
- Sasha requested 5-6 hours on Sunday to do these tests
Discussion on CPP and GEM-TRD tests
- Restricted or controlled access for 31st depends on if there is 1/2 rack available or not