Difference between revisions of "Sep 29, 2008 Calorimetry"
From GlueXWiki
(→Documents to Review) |
(→Documents to Review) |
||
Line 23: | Line 23: | ||
http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Geometry_effect_timing.pdf | http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Geometry_effect_timing.pdf | ||
+ | http://www.jlab.org/Hall-D/software/wiki/images/0/0c/Geometry_effect_timing.pdf | ||
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 10:29, 22 September 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Sep 2 calibration meeting
- Each subsystem must complete blanks in specification table.
Items for followup from Sep 15 meeting
- George: report on trip to Edmonton
- Decision on Bcal sampling fraction needed by Sep. - Initial work by Stamatis was reported
- Resolution studies (Blake)
- Up-to-date geometry ONGOING.
- Decreased threshold for FM pmts. ONGOING
- Position resolution - understand dependence on granularity.
- Different segmentation for the outer section. - LOWER PRIORITY
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
Documents to Review
http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Geometry_effect_timing.pdf http://www.jlab.org/Hall-D/software/wiki/images/0/0c/Geometry_effect_timing.pdf
Tentative Agenda
- Announcements
- Results on study of increased sampling in BCAL
- Status of simulation tasks
Minutes
Attending: