Difference between revisions of "BLTWG Meeting 10/2/2008"
From GlueXWiki
(→Agenda) |
|||
Line 7: | Line 7: | ||
# Writeups needed for the pre-brief materials packet - see below | # Writeups needed for the pre-brief materials packet - see below | ||
− | # Tim's updated tagger hall drawings | + | # [[Tagged Beam Group Engineering Drawings|Tim's updated tagger hall drawings]] |
# Resolution on tagger pole shape - ''Jim'', ''Yang'' | # Resolution on tagger pole shape - ''Jim'', ''Yang'' | ||
# Remaining simulation studies needed for review - ''Richard'' | # Remaining simulation studies needed for review - ''Richard'' | ||
# Progress on simulation of the collimators - ''Sascha'' | # Progress on simulation of the collimators - ''Sascha'' |
Revision as of 14:31, 29 September 2008
- Time: 9:30 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present:
Agenda
- Writeups needed for the pre-brief materials packet - see below
- Tim's updated tagger hall drawings
- Resolution on tagger pole shape - Jim, Yang
- Remaining simulation studies needed for review - Richard
- Progress on simulation of the collimators - Sascha