Difference between revisions of "March 25, 2021 CPP Design Meeting"
From GlueXWiki
(→Agenda) |
(→Minutes and Action Items) |
||
Line 33: | Line 33: | ||
== Minutes and Action Items == | == Minutes and Action Items == | ||
+ | * James to make parts for Microscope new location by end of June | ||
+ | * Tim to re-measure distance Microscope can move DS | ||
+ | * Ilya stated that the 45° joint in the lead absorber is not an issue. He will have a closer look at the 90° joints | ||
+ | * Need to machine the steel on the 90° joints of the lead absorber so there are no gaps | ||
+ | * Tim (Stephanie)to send Beni US moveable lead shield configuration |
Revision as of 08:53, 8 April 2021
Meeting Time and Place
Thursday March 25, 2021, 2pm Bluejeans https://bluejeans.com/465620466
- Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_25,_2021_CPP_Design_Meeting/ERR_discussion
- Readiness Review Report
- Lead Configuration
- MWPC Issues
- Microscope move
- Design/Fab/Procurement status
- Stand
- Steel
- Fcal platform mods
- Things to work out
- Gas line manifold/bubblers (Beni has some)
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
- Modified US vacuum system
- Solid target installation
- Documentation for ERR
- Microscope move
Minutes and Action Items
- James to make parts for Microscope new location by end of June
- Tim to re-measure distance Microscope can move DS
- Ilya stated that the 45° joint in the lead absorber is not an issue. He will have a closer look at the 90° joints
- Need to machine the steel on the 90° joints of the lead absorber so there are no gaps
- Tim (Stephanie)to send Beni US moveable lead shield configuration