Difference between revisions of "Controls Meeting 22-Apr-2021"
From GlueXWiki
Line 2: | Line 2: | ||
* Solenoid status | * Solenoid status | ||
*: Vacuum alarms (Tim) | *: Vacuum alarms (Tim) | ||
− | :* New PDU for the PXI chassis (Nick) | + | *: Rearrangement of PLC boards (Nick) |
+ | *: New PDU for the PXI chassis (Nick) | ||
* EPICS gateway crashes and Hall D PXI (Hovanes, Brian) | * EPICS gateway crashes and Hall D PXI (Hovanes, Brian) | ||
* Magnet power supply related temperature readouts (Scot) | * Magnet power supply related temperature readouts (Scot) | ||
* FDC gas PLC modifications (Nick) | * FDC gas PLC modifications (Nick) | ||
+ | *: swapped channels found by Lubomir | ||
* FCAL2 chillers (Nick) | * FCAL2 chillers (Nick) | ||
* New DIRC N2 controls | * New DIRC N2 controls |
Revision as of 09:00, 21 April 2021
- Announcements
- Solenoid status
- Vacuum alarms (Tim)
- Rearrangement of PLC boards (Nick)
- New PDU for the PXI chassis (Nick)
- EPICS gateway crashes and Hall D PXI (Hovanes, Brian)
- Magnet power supply related temperature readouts (Scot)
- FDC gas PLC modifications (Nick)
- swapped channels found by Lubomir
- FCAL2 chillers (Nick)
- New DIRC N2 controls
- Other items
- network switch in the tagger hall
Time/Location
10:00am Thursday 22-Apr-2021