Difference between revisions of "Controls Meeting 22-Apr-2021"
From GlueXWiki
Line 9: | Line 9: | ||
*: tag count reduction | *: tag count reduction | ||
*: swapped channels found by Lubomir | *: swapped channels found by Lubomir | ||
− | * FCAL2 chillers ( | + | * FCAL2 chillers (Tim) |
* New DIRC N2 controls | * New DIRC N2 controls | ||
* Other items | * Other items |
Revision as of 09:04, 21 April 2021
- Announcements
- Solenoid status
- Vacuum alarms (Tim)
- Rearrangement of PLC boards (Nick)
- New PDU for the PXI chassis (Nick)
- EPICS gateway crashes and Hall D PXI (Hovanes, Brian)
- Magnet power supply related temperature readouts (Scot)
- FDC gas PLC modifications (Nick)
- tag count reduction
- swapped channels found by Lubomir
- FCAL2 chillers (Tim)
- New DIRC N2 controls
- Other items
- network switch in the tagger hall
Time/Location
10:00am Thursday 22-Apr-2021