Difference between revisions of "JEF meeting, July 30, 2021"
From GlueXWiki
m (→Minutes) |
|||
Line 43: | Line 43: | ||
** Install in hall next week? | ** Install in hall next week? | ||
* Joanna continues wrapping crystals, can do 5-8/day | * Joanna continues wrapping crystals, can do 5-8/day | ||
− | * Igal looking into adding muon detector into JEF simulation | + | * Igal looking into adding CPP muon detector into JEF simulation |
* Igal generating new MC samples for η→π0γγ studies | * Igal generating new MC samples for η→π0γγ studies |
Latest revision as of 11:41, 30 July 2021
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- Module fabrication
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
Minutes
Attendees: Liping, Igal, Sasha, Varun, Jane, Jon, Phil, S.T.
- SICCAS recieved powder from vendor, working on making sample crystals to test
- We will try to arrange a follow-up meeting in the near future
- Still awaiting update on delivery schedule
- Crytur confirmed can produce crystals this year
- COMCAL refurbishment almost complete
- All electronics installed
- Sasha looked at signals: operational except for 3 channels with new dividers, to be fixed
- LMS ready to go: fibers glued to crystals
- Amount of light more than expected but not uniform: depends on where fiber is with respect to the center of the bundle
- Working on adding a diffuser to improve uniformity
- Considering using more than one LED
- Install in hall next week?
- All electronics installed
- Joanna continues wrapping crystals, can do 5-8/day
- Igal looking into adding CPP muon detector into JEF simulation
- Igal generating new MC samples for η→π0γγ studies