Difference between revisions of "Π polarizability Meeting Oct 27, 2021"
From GlueXWiki
(→Preliminary Agenda) |
|||
Line 65: | Line 65: | ||
== Minutes == | == Minutes == | ||
− | '' Attending: | + | '' Attending: Albert, Alex, Andrew, Beni, David, Ebode, Elton, Gary, Ilya, Mark, Nikhil, Rory, Simon |
+ | |||
+ | # Previous CPP meeting: [[π polarizability Meeting Oct 20, 2021|Oct 20, 2021]] | ||
+ | # Announcements | ||
+ | #* Delays in beam to Hall D is putting pressure on the schedule. Beni mentioned that there has been an incident in Hall A that has them down and may delay the energy change. We need to prepare a plan for a trigger test in case any time become available. | ||
+ | #* [[CPP and NPP Experiment Configuration]] | ||
+ | #* Elton has created an index wiki page that can be used to place all the production experimental information. We should use it to centralize the information already available. | ||
+ | # Action Items | ||
+ | #* Rory will check that Walt has billed JLab. | ||
+ | #* Ilya agreed to develop a draft plan for the TOF trigger tests | ||
+ | # Software/Calibration for CPP (David, Alex and Sean) | ||
+ | #* Alex: Sean developed a dummy translation table for the EEL test setup and Alex has checked it. | ||
+ | #* He has written a test FMWPC_online plugin using the translation table and showed that occupancy plots reproduce those generated by mwpc_checks script. | ||
+ | #* Created a FMWPC_hits objects, which contain "calibrated hits" from the pulse parameters provided by the firmware. ADC integrals -> dE, TDC -> ns. He needs input from the group to develop further | ||
+ | #* Discussion: Probably will create some "clusters" of hits that contain dE info + position + size information. These clusters would be used to match up with tracking information. Alex will work on a clustering algorithm. | ||
+ | #* David: Has developed some code for hdview2 to show FMWPC hit information on a git branch. Needs to finish up and generate a pull request. | ||
+ | # AI for Experimental Controls testing during CPP | ||
+ | #* Data provided by Andrew seems to be all muons and no pions. He will regenerate the files to be checked by David and Nikhil. | ||
+ | # MWPC Testing | ||
+ | #* [https://logbooks.jlab.org/book/hdfmwpc FMWPC Log Book] | ||
+ | #* See https://logbooks.jlab.org/entry/3932878 Summary of efficiency estimates] | ||
+ | #* Five MWPCs can run with "zero" baseline threshold. Denethor needs a Th=200. | ||
+ | #* Galadriel and Frodo need Th > 500 due to large electronic noise. | ||
+ | #* Good news is that design seems to be sound. Rory suspects that the two "noisy" chambers have some grounding issues. He will investigate further when he has a chance to come to JLab. | ||
+ | #* Elton: What is the basis for the nominal setting of HV=1765 V? Rory: Using the small prototype, the 55Fe source was used to establish the gain at UMass of 10^5 for HV=1800 V. However, the premix gas at JLab is somewhat different and somewhat higher gain. Adjusting for this difference, Rory expects that the JLab gas conditions yield a gain of 10^5 at a HV=1765 V. | ||
+ | # Slow Controls (Beni) | ||
+ | # hdgeant4 updates (Mark) | ||
+ | # TOF Trigger | ||
+ | #* Ilya will draft a plan for testing the TOF trigger if we can find time this fall. | ||
+ | # GlueX Data Analysis | ||
+ | # CPP Simulations (Simon) | ||
+ | #* Has added trigger scintillators (labeled ctof) to the geometry, sensitive volumes in geant4, mcsmear, class of fmwpc in reconstruction. | ||
+ | #* Plans to submit a pull request soon. | ||
+ | # PID + AI | ||
+ | # Other business | ||
+ | #* Need to finalize the configuration of MWPCs next week for discussions with Tim/Stephanie | ||
+ | # Next meeting |
Revision as of 16:50, 27 October 2021
Meeting Time And Location
09:30 EST (JLab time) Weekly Meeting
REMOTE during Covid-19
Connecting
You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- Meeting ID: 949 429 419
- (you may need to type this in, depending how you connect)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via iOS or Android App:
- Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: (408) 740-7256 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Action Items
- Follow up on procurement for electronic enclosures.
- Develop a plan for beam TOF trigger tests
Preliminary Agenda
- Previous CPP meeting: Oct 20, 2021
- Announcements
- Action Items
- Software/Calibration for CPP (David, Alex and Sean)
- AI for Experimental Controls testing during CPP
- MWPC Testing
- Slow Controls (Beni)
- hdgeant4 updates (Mark)
- TOF Trigger (Simon)
- GlueX Data Analysis
- CPP Simulations
- PID + AI
- Other business
- Next meeting
Minutes
Attending: Albert, Alex, Andrew, Beni, David, Ebode, Elton, Gary, Ilya, Mark, Nikhil, Rory, Simon
- Previous CPP meeting: Oct 20, 2021
- Announcements
- Delays in beam to Hall D is putting pressure on the schedule. Beni mentioned that there has been an incident in Hall A that has them down and may delay the energy change. We need to prepare a plan for a trigger test in case any time become available.
- CPP and NPP Experiment Configuration
- Elton has created an index wiki page that can be used to place all the production experimental information. We should use it to centralize the information already available.
- Action Items
- Rory will check that Walt has billed JLab.
- Ilya agreed to develop a draft plan for the TOF trigger tests
- Software/Calibration for CPP (David, Alex and Sean)
- Alex: Sean developed a dummy translation table for the EEL test setup and Alex has checked it.
- He has written a test FMWPC_online plugin using the translation table and showed that occupancy plots reproduce those generated by mwpc_checks script.
- Created a FMWPC_hits objects, which contain "calibrated hits" from the pulse parameters provided by the firmware. ADC integrals -> dE, TDC -> ns. He needs input from the group to develop further
- Discussion: Probably will create some "clusters" of hits that contain dE info + position + size information. These clusters would be used to match up with tracking information. Alex will work on a clustering algorithm.
- David: Has developed some code for hdview2 to show FMWPC hit information on a git branch. Needs to finish up and generate a pull request.
- AI for Experimental Controls testing during CPP
- Data provided by Andrew seems to be all muons and no pions. He will regenerate the files to be checked by David and Nikhil.
- MWPC Testing
- FMWPC Log Book
- See https://logbooks.jlab.org/entry/3932878 Summary of efficiency estimates]
- Five MWPCs can run with "zero" baseline threshold. Denethor needs a Th=200.
- Galadriel and Frodo need Th > 500 due to large electronic noise.
- Good news is that design seems to be sound. Rory suspects that the two "noisy" chambers have some grounding issues. He will investigate further when he has a chance to come to JLab.
- Elton: What is the basis for the nominal setting of HV=1765 V? Rory: Using the small prototype, the 55Fe source was used to establish the gain at UMass of 10^5 for HV=1800 V. However, the premix gas at JLab is somewhat different and somewhat higher gain. Adjusting for this difference, Rory expects that the JLab gas conditions yield a gain of 10^5 at a HV=1765 V.
- Slow Controls (Beni)
- hdgeant4 updates (Mark)
- TOF Trigger
- Ilya will draft a plan for testing the TOF trigger if we can find time this fall.
- GlueX Data Analysis
- CPP Simulations (Simon)
- Has added trigger scintillators (labeled ctof) to the geometry, sensitive volumes in geant4, mcsmear, class of fmwpc in reconstruction.
- Plans to submit a pull request soon.
- PID + AI
- Other business
- Need to finalize the configuration of MWPCs next week for discussions with Tim/Stephanie
- Next meeting