Difference between revisions of "Run Planning Meeting Notes, November 18 - November 24, 2021"
From GlueXWiki
(→Monday, November 22) |
(→Monday, November 22) |
||
Line 1: | Line 1: | ||
=Monday, November 22= | =Monday, November 22= | ||
#Last 72h: | #Last 72h: | ||
− | #* Recorded ~ | + | #* Recorded ~2.5B triggers on LHe |
#* Switched to Liquid deuterium during swing shift on Saturday: [https://logbooks.jlab.org/entry/3947358 Target cooling] | #* Switched to Liquid deuterium during swing shift on Saturday: [https://logbooks.jlab.org/entry/3947358 Target cooling] | ||
#** [https://logbooks.jlab.org/entry/3947422 Trigger/DAQ/Data rate at 140 nA]: 68 kHz w/ 96% live time | #** [https://logbooks.jlab.org/entry/3947422 Trigger/DAQ/Data rate at 140 nA]: 68 kHz w/ 96% live time | ||
#Issues: | #Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3947488 AC x,y lock positions had x<->y interchanged, now X=0.0 and Y=-0.1] | ||
#Plan: | #Plan: | ||
#* Continue production at 140 nA on diamond | #* Continue production at 140 nA on diamond |
Revision as of 18:59, 21 November 2021
Monday, November 22
- Last 72h:
- Recorded ~2.5B triggers on LHe
- Switched to Liquid deuterium during swing shift on Saturday: Target cooling
- Trigger/DAQ/Data rate at 140 nA: 68 kHz w/ 96% live time
- Issues:
- Plan:
- Continue production at 140 nA on diamond
- Analysis update
Friday, November 19
- Last 24h:
- Repair work for RF separator did not end up impacting taking beam -- yay!
- Added ~2B triggers: [1]
- Issues:
- A couple of minor issues:
- DAQ computer acting weird, but this did not impact actual data taking
- Alcohol bubbler too dark to see: [2]
- A couple of minor issues:
- Plan:
- Continue production at 150nA on diamond
- Saturday day: Low current + empty target?
- Saturday swing: switch to liquid deuterium
- Analysis update
Thursday November 18
- Last 24h:
- ~1.4 B triggers (250M AMO): [3]
- Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
- Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
- Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
- Issues:
- writing on tape?
- High temperature of locked-up FCAL bases? [4]
- Shift crew will take over servicing FCAL base lock ups. wiki instructions
- Plan:
- Continue production at 150nA on diamond
- Analysis update