(Created page with "== Meeting Time and Place == Thursday December 09, 2021, 1pm Bluejeans https://bluejeans.com/465620466 * Present - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor...") |
(→Requirements and things to finalize) |
||
Line 17: | Line 17: | ||
** Be 90% pure or better (price same for 98% pure) | ** Be 90% pure or better (price same for 98% pure) | ||
** Steel standoffs in bottom poly sheet | ** Steel standoffs in bottom poly sheet | ||
− | ** 1mm al window ok for collimator exit of target | + | ** 1mm al window ok for collimator exit of target |
** Beryllium sealing - ongoing discussions with RadCon | ** Beryllium sealing - ongoing discussions with RadCon | ||
** Existing 5cm lead and 1cm steel at collimator exit wall ok | ** Existing 5cm lead and 1cm steel at collimator exit wall ok |
Revision as of 13:08, 14 December 2021
Contents
Meeting Time and Place
Thursday December 09, 2021, 1pm Bluejeans https://bluejeans.com/465620466
- Present - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Mark Stevens, Vitaly
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/October_14,_2021_KLONG_Design_Meeting
- Vitaly presentation on power absorption
- Collimator Cave Beamline
- Heat absorbed by Be and Tungsten (.6kw and 6Kw respectively)Johan study?
Requirements and things to finalize
- Cool tungsten plug to below temperature that affects lead (327°C)
- 5 cm beam tube through sweep magnet and 6 cm to final target
- Moveable out of beamline
- Be 90% pure or better (price same for 98% pure)
- Steel standoffs in bottom poly sheet
- 1mm al window ok for collimator exit of target
- Beryllium sealing - ongoing discussions with RadCon
- Existing 5cm lead and 1cm steel at collimator exit wall ok
- 10 cm lead at both walls inside collimator cave
- 10 cm distance from beryllium target to downstream vacuum window of.
- Remove PS vacuum chamber and put in 6cm beampipe
- 5 mm gap between beryllium and tungsten so heat does not transfer
Minutes
- Calcs for heating of Tungsten and Beryllium not completed yet - Igor to email Johan
- Eugene asked about temperature sensors - Mark had some suggestions -need rad hard and put on copper plates
- Is 1mm aluminum window at exit of target ok? Should be
Action Items
- Look for temp sensors - Keith/Tim
- Complete heat calcs - Johan
- Determine if 1mm aluminum window ok at exit of target - Igor
- Continue working on drawing package - Keith