Difference between revisions of "Dec 8, 2008 Calorimetry"
From GlueXWiki
(→Tentative Agenda (Emphasis is Calibration)) |
(→Tentative Agenda (Emphasis is Calibration)) |
||
Line 25: | Line 25: | ||
# FCAL Update | # FCAL Update | ||
# BCAL | # BCAL | ||
− | ## [[Fiber Test with SiPM | Testing of fibers with SiPM readout and Sr90 source]] (Beni)[http://jlab.org/~zihlmann/ | + | ## [[Fiber Test with SiPM | Testing of fibers with SiPM readout and Sr90 source]] (Beni)[http://jlab.org/~zihlmann/fibertest/ScintillationFiberTestsatJlab.ppt Talk] |
## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1130 Lead Specification] (Elton) | ## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1130 Lead Specification] (Elton) | ||
## Magnetic Field Update (JLab) | ## Magnetic Field Update (JLab) |
Revision as of 19:11, 5 December 2008
Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Nov 24 meeting
- Updates on Calibration Specification Table.
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of Bcal on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).
Documents to Review
- Calibration/monitoring update Athens: Media:APD_vs_tube_linearity.ppt
Tentative Agenda (Emphasis is Calibration)
- Announcements
- Calibration
- Progress on filling in the Calibration Specification Table.
- FCAL Update
- BCAL
- Testing of fibers with SiPM readout and Sr90 source (Beni)Talk
- Lead Specification (Elton)
- Magnetic Field Update (JLab)
- Other updates
- Any other business
Minutes
Attending: