Difference between revisions of "Dec 22, 2008 Calorimetry"
From GlueXWiki
(→Items for followup from Dec 7 meeting) |
(→Items for followup from Dec 7 meeting) |
||
Line 13: | Line 13: | ||
#* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina) | #* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina) | ||
# Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting). | # Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting). | ||
− | # | + | # Options for vendors delivering specific lead sheet sizes (Tim) |
= Documents to Review= | = Documents to Review= |
Revision as of 15:04, 8 December 2008
Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Items for followup from Dec 7 meeting
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of Bcal on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).
- Options for vendors delivering specific lead sheet sizes (Tim)
Documents to Review
- Resolution studies (Blake)
Tentative Agenda
- Announcements
- Calibration
- Progress on filling in the Calibration Specification Table.
- FCAL Update
- BCAL
- Resolution studies (Blake)
- Magnetic Field Update (JLab)
- Any other business
Minutes
Attending: