Difference between revisions of "Run Planning Meeting Notes, June 23 - June 29, 2022"
From GlueXWiki
(→Thursday June 23) |
(→Thursday June 23) |
||
Line 28: | Line 28: | ||
#* [https://logbooks.jlab.org/entry/4006229 AD00C x position moving] | #* [https://logbooks.jlab.org/entry/4006229 AD00C x position moving] | ||
#* (Tagger NMR) | #* (Tagger NMR) | ||
− | #* DIRC sensor) | + | #* (DIRC sensor) |
− | #* DAQ livetime | + | #* (DAQ livetime) |
#* (Beam position stability) | #* (Beam position stability) | ||
#* (U1-10-TOP MPOD crate) | #* (U1-10-TOP MPOD crate) |
Revision as of 07:25, 23 June 2022
↑ Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday June 23
- Last 24h:
- Inadvertent change to tagger magnet settings backed out
- Target moved out
- Richard took the microscope scan data
- Bleedthrough beam current was very low
- Thunderstorms made TAC run impossible.
- Sasha configured the trigger for straight track running
- Beam back near midnight but ran into DAQ problems.
- Overnight empty target production
- Shift Summaries
- Reports
- Issues
- DAQ crash ROCTRIG2 - called Sergey
- DAQ lost comms with ROCBCAL11 - stop & restart DAQ fixed this
- AD00C x position moving
- (Tagger NMR)
- (DIRC sensor)
- (DAQ livetime)
- (Beam position stability)
- (U1-10-TOP MPOD crate)
- Plans
- No beam from 6:30am until sometime after 3pm, power shedding.
- Walk-through at 11am
- Commissioning steps temporarily postponed:
- Flux optimization/Act .Col. calibration
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.