Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"
From GlueXWiki
(→Past 24 hours) |
(→Past 24 hours) |
||
Line 17: | Line 17: | ||
* Production on Empty Target (~0.9 B events). Need about twice that. Suggest we stay on Empty Target, but run at 60 nA after maintenance. | * Production on Empty Target (~0.9 B events). Need about twice that. Suggest we stay on Empty Target, but run at 60 nA after maintenance. | ||
* [https://cebaf.jlab.org/dtm/open-events?event_id=16600 Storm Takes Down Accelerator] | * [https://cebaf.jlab.org/dtm/open-events?event_id=16600 Storm Takes Down Accelerator] | ||
+ | * Smooth beam after recovery. | ||
=== Shift Reports === | === Shift Reports === |
Revision as of 07:57, 14 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday July 14
Past 24 hours
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~0.9 B events). Need about twice that. Suggest we stay on Empty Target, but run at 60 nA after maintenance.
- Storm Takes Down Accelerator
- Smooth beam after recovery.
Shift Reports
Reports
Issues
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Nick to work on DIRC environment
- Following Maintenance: Plan to return to Full Pb Target and continue taking production data.