Line 34: | Line 34: | ||
=== Issues === | === Issues === | ||
− | * [] | + | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location |
+ | * [https://logbooks.jlab.org/entry/4121311 Reconstructed Photon Beam Energy Spectrum (Churamani) ] Deep between 10-11 GeV | ||
Pending: | Pending: | ||
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed. | * BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed. | ||
− | |||
=== Plans === | === Plans === |
Revision as of 21:24, 1 February 2023
Hall D counting room white board
Thursday February 2
Past 24 hours
- Maintenance day
- Production on diamond. ABU= ?? h for the day.
Shift Reports
- [ https://logbooks.jlab.org/entry/4121686 Day shift summary]
- [ https://logbooks.jlab.org/entry/4121890 Swing shift summary]
- [ Owl shift summary]
- [ Early Riser shift summary]
Reports
- HVB current during HV scans (Naomi).
- Translation table updated for TAGM (Justin)
- Swapped HV module for TAGH ch 145 to 168 (Boris)
- attenuation in different materials (Lubomir)
- Remote reset for CAEN chassis (Tim and Bobby)
- GlueX Statistics
- PARA 0/90: %
- PERP 0/90: %
- PARA 45/135: %
- PERP 45/135: %
- AMO : %
Issues
- Start Counter (Beni) We want to confirm that the cables are in the right location
- Reconstructed Photon Beam Energy Spectrum (Churamani) Deep between 10-11 GeV
Pending:
- BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs para(0/90)
- 2 runs perp(0/90)
- 2 runs para(45/135)
- 2 runs perp(45/135)
- 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
- Trigger fine tuning Thursday? (A. Somov)