Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"
From GlueXWiki
Line 23: | Line 23: | ||
* Rate Scan study by Sasha: Swing shift | * Rate Scan study by Sasha: Swing shift | ||
* Production resumed with 0/90 PARA after Sasha's rate scan completion | * Production resumed with 0/90 PARA after Sasha's rate scan completion | ||
− | * ABU= | + | * ABU=X.X hr |
=== Shift Reports === | === Shift Reports === |
Revision as of 21:22, 8 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday March 9
Past 24 hours
- Work on Injector(early day shift)
- HI test Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8
- Production resumed at swing shift with AMO radiator configuration
- Rate Scan study by Sasha: Swing shift
- Production resumed with 0/90 PARA after Sasha's rate scan completion
- ABU=X.X hr
Shift Reports
- [ Early Riser Shift Summary]
- Day Shift Summary
- Swing Shift Summary
- [ Owl Shift Summary]
Reports
- High intensity test with Pb and Mo foils(Justin)
- [1] [2] Pb and Molybdenum foil inserted](Lubomir)
- [3] Doubled the thickness of the Molybdenum (Lubomir)
- [4] [5] CDC currents with W and W+Pb foils (Naomi)
- [6] CDC currents with W and Mo foils (Naomi)
- [7] AI on 16:25 3/8 swing (Naomi)
- [8] Beam halo alarms
Issues
Plans
- TAC run whenever opportunity comes( HallC run at small current or down)
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)