Difference between revisions of "Run Planning Meeting Notes, March 15 - March 22, 2023"
From GlueXWiki
(→Friday March 17) |
(→Friday March 17) |
||
Line 9: | Line 9: | ||
* Dropped to RESTRICTED for tours at 3:45pm 3/16 | * Dropped to RESTRICTED for tours at 3:45pm 3/16 | ||
** Temperature in the hall rose to >77 degrees, recovered in time | ** Temperature in the hall rose to >77 degrees, recovered in time | ||
− | ** Visits ended by 7: | + | ** Visits ended by 7:00pm |
** Hall D swept and requested beam restoration | ** Hall D swept and requested beam restoration | ||
** Started off with new harp scans, then continued production | ** Started off with new harp scans, then continued production |
Revision as of 08:31, 17 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394 MCC Whiteboard Hall D counting room white board Spreadsheet with list of runs Integrated Trigger Count Hall D Logbook
Contents
Friday March 17
Past 24 hours
- Dropped to RESTRICTED for tours at 3:45pm 3/16
- Temperature in the hall rose to >77 degrees, recovered in time
- Visits ended by 7:00pm
- Hall D swept and requested beam restoration
- Started off with new harp scans, then continued production
- Beam accounting point of interest: tour down was counted as BANU
Shift Summaries
Reports
- one fcal base changed
- more raw mode data taken (run 121163) around noon
- possible new resonance in K+K-?
Issues
- Parsing issue with rocBCAL7 (rocID=37 and slot=16), recovered by power cycling rocbcal7
- TAGM column 16, fadc250 stopped counting in middle of run around noon, run ended, recovered by power cycling roctagm1
- Problem writing raw data to tape resolved, transfer to tape resumed
- Issue writing to local disk blocked DAQ during 121161, resolved by Sergey and running resumed
- Lockup of fcal bases continues regularly, resolved by reset procedure at the end of run (or sometimes on its own!)
Plans
- Another high current run at 900 nA during the day today
- we still have ~8hr of 900nA running in our allowance -- discussed at 8:00 meeting
- main participants needed: Justin, Sasha, Lubomir, Naomi
- trigger conditions already established for stable DAQ at 75kHz event rate @ 900nA [1][2]
- Continue running production
- Straight-track run ~50nA
- planned for March 19th Sunday swing
- magnetic field ramped down
- access not required
- people to contact: Justin, Sasha, Lubomir, Naomi
- After beam goes away, one shift of BCAL LED data requsted -- Mark Dalton, Varun
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday March 16
Past 24 hours
- Tagger Hall Access requested by Hovanes
- came as a surprise to RADCON and MCC crew
- discussion during the 8:00 meeting
- we can do better
- High current run(900 nA)
Shift Summaries
Reports
- Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)
- Summary of trigger threshold scan and 1 billion events collected at 900 nA
Issues
- Parsing issue with rocBCAL7 (rocID=37 and slot=16), suggest FADC250 replacement
Plans
- Continue running production
- Visitors tour of Hall D starts at 4:45pm 3/16
- Data collection should end sometime after 4:00pm, when convenient before 4:20
- Contact MCC and ask to drop Hall D to RESTRICTED, tagger hall not affected
- Ask them to contact RADCON to sweep Hall D for the visit
- Visit should end by 6:45pm
- As soon as they leave, put Hall D back in Power Permit and request beam restoration
- Start off with new harp scans, then continue production
- Straight-track run ~50nA
- planned for March 19th Sunday swing
- magnetic field ramped down
- access not required
- people to contact: Justin, Sasha, Lubomir, Naomi
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)