Difference between revisions of "Run Planning Meeting Notes, March 11 - march 15, 2024"
From GlueXWiki
(→Tuesday, March 12 2024) |
(→Tuesday, March 12 2024) |
||
Line 7: | Line 7: | ||
** Hovanes reduced motor speed to 30% of nominal | ** Hovanes reduced motor speed to 30% of nominal | ||
** We decided to drop the program on 10<sup>-4</sup> and 3*10<sup>-4</sup> RL radiators, as well as Ion Chambers threshold calib. on those. We also drop the plan for our Harp scan since it uses the same motor. | ** We decided to drop the program on 10<sup>-4</sup> and 3*10<sup>-4</sup> RL radiators, as well as Ion Chambers threshold calib. on those. We also drop the plan for our Harp scan since it uses the same motor. | ||
+ | * 01:05 [https://logbooks.jlab.org/entry/4265328 radiator motion issue again despite reduced speed] | ||
+ | * 03:20 Ion Chamber calibration done (2*10<sup>-5</sup> radiator only because of motor issue) | ||
+ | * 05:20 Active Colimator calibration done (high gain only because of radiator motor issue) | ||
− | * | + | *MCC Harp scans: [https://logbooks.jlab.org/entry/4265217 5C00], [https://logbooks.jlab.org/entry/4265288 5C11], [https://logbooks.jlab.org/entry/4265289 5C11b] |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
Line 27: | Line 24: | ||
=== Issues === | === Issues === | ||
− | * | + | * Amo radiator/harp motor. |
+ | * [https://logbooks.jlab.org/entry/4265319 Notable bleedthrough] (unexpected but not an issue?). It is clearly correlated with beam on in Hall C. [https://logbooks.jlab.org/entry/4265328 It seems it was fixed during the night] | ||
+ | |||
+ | |||
+ | *Questions: | ||
+ | **Access to tagger to look at amorphous radiator/harp motor? | ||
+ | **Man shifts for Friday day/swing? | ||
+ | |||
+ | |||
+ | |||
=== Plan === | === Plan === | ||
* Noon: rapid access (2h, 5 persons) for DAQ and detector work. | * Noon: rapid access (2h, 5 persons) for DAQ and detector work. | ||
* Link to runplan: https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Winter2024#Runplan | * Link to runplan: https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Winter2024#Runplan |
Revision as of 07:34, 12 March 2024
Tuesday, March 12 2024
Past 24 hours
- 6:37 LCW fluctuation tripped PS magnet.
- Hall C pass change completed early afternoon. Then, Ops started to tune hall D beam.
- 17:30 Ops starting to tune beam to Hall D tagger.
- 23:30 Although the first amorphous radiator motion was normal, it got stuck in its way to get retracted.
- Hovanes reduced motor speed to 30% of nominal
- We decided to drop the program on 10-4 and 3*10-4 RL radiators, as well as Ion Chambers threshold calib. on those. We also drop the plan for our Harp scan since it uses the same motor.
- 01:05 radiator motion issue again despite reduced speed
- 03:20 Ion Chamber calibration done (2*10-5 radiator only because of motor issue)
- 05:20 Active Colimator calibration done (high gain only because of radiator motor issue)
- Shift Summary
- ABUs: h
Issues
- Amo radiator/harp motor.
- Notable bleedthrough (unexpected but not an issue?). It is clearly correlated with beam on in Hall C. It seems it was fixed during the night
- Questions:
- Access to tagger to look at amorphous radiator/harp motor?
- Man shifts for Friday day/swing?
Plan
- Noon: rapid access (2h, 5 persons) for DAQ and detector work.
- Link to runplan: https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Winter2024#Runplan