Difference between revisions of "June 04, 2024 KLONG CPS Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 30: Line 30:
 
== Minutes ==
 
== Minutes ==
 
* Reviewed minutes from last meeting
 
* Reviewed minutes from last meeting
** Pavel has run the radiation and energy absorption (Fluka) for the latest absorber and shielding configuration
+
* Pavel has run the radiation and energy absorption (Fluka) for the latest absorber and shielding configuration
*** Radiation levels at magnet coils are 2e4 gray for 10000 hrs running.  
+
** Radiation levels at magnet coils are 2e4 gray for 10000 hrs running.  
**** No need for expensive epoxy ($5K per gallon)
+
*** No need for expensive epoxy ($5K per gallon)
**** CTD-101K resin can be used - good for 1e6 gray minumum
+
*** CTD-101K resin can be used - good for 1e6 gray minimum
 +
* Looking at 3D model
 +
** Core assembly coming together
 +
*** Meet with Alignment group Thursday to discus alignment/fiducialization plan
 +
*** Looked at "birthday cake" stacking of steel - need features for stacking lead and heavy concrete
 +
*** Copper absorber vacuum brazing test piece has been machined - will get tubing ready to braze in coming weeks
 +
** Air casters for moving - AeroGo coming to Demo system next week

Revision as of 11:36, 6 June 2024

Meeting Time and Place

Tuesday, June 04, 2024, 1:00pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

  • Reviewed minutes from last meeting
  • Pavel has run the radiation and energy absorption (Fluka) for the latest absorber and shielding configuration
    • Radiation levels at magnet coils are 2e4 gray for 10000 hrs running.
      • No need for expensive epoxy ($5K per gallon)
      • CTD-101K resin can be used - good for 1e6 gray minimum
  • Looking at 3D model
    • Core assembly coming together
      • Meet with Alignment group Thursday to discus alignment/fiducialization plan
      • Looked at "birthday cake" stacking of steel - need features for stacking lead and heavy concrete
      • Copper absorber vacuum brazing test piece has been machined - will get tubing ready to braze in coming weeks
    • Air casters for moving - AeroGo coming to Demo system next week