Difference between revisions of "Start Counter Operations 2018Fall"
From GlueXWiki
(→Start Counter Performance Fall 2018) |
(→Start Counter Performance Fall 2018) |
||
Line 1: | Line 1: | ||
==== Start Counter Performance Fall 2018 ==== | ==== Start Counter Performance Fall 2018 ==== | ||
− | The gain and performance of the Start Counter paddles is rather constant over the fall of 2018 with the exception of a small period where the run conditions were quite different. This was the period with very low intensity running, 40nA of e-beam current rather than the usual 200nA. This is demonstrated by looking at the dEdx data from the start counter as a function of run number. During the low intensity running the gain was about | + | The gain and performance of the Start Counter paddles is rather constant over the fall of 2018 with the exception of a small period where the run conditions were quite different. This was the period with very low intensity running, 40nA of e-beam current rather than the usual 200nA. This is demonstrated by looking at the dEdx data from the start counter as a function of run number. During the low intensity running the gain was about 4% higher.<br> |
[[File:sc_dedx_fall2018.png| 300px]] | [[File:sc_dedx_fall2018.png| 300px]] |
Revision as of 18:31, 24 September 2024
Start Counter Performance Fall 2018
The gain and performance of the Start Counter paddles is rather constant over the fall of 2018 with the exception of a small period where the run conditions were quite different. This was the period with very low intensity running, 40nA of e-beam current rather than the usual 200nA. This is demonstrated by looking at the dEdx data from the start counter as a function of run number. During the low intensity running the gain was about 4% higher.