Difference between revisions of "Target"
From GlueXWiki
Line 5: | Line 5: | ||
The agenda is not strict and should accommodate discussions | The agenda is not strict and should accommodate discussions | ||
* General requirements for the GlueX target 10 min | * General requirements for the GlueX target 10 min | ||
− | *# | + | *# LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator) |
− | *# | + | *# Beam power in LH2 < 100 uW (high luminocity) |
*# Hall B target adapted to Hall D: [http://www.jlab.org/~whitey/HALL_D_HYDROGEN_TARGET.pdf Hall D hydrogen target] | *# Hall B target adapted to Hall D: [http://www.jlab.org/~whitey/HALL_D_HYDROGEN_TARGET.pdf Hall D hydrogen target] | ||
+ | *# Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc) | ||
*# Solid targets (discussion) | *# Solid targets (discussion) | ||
* Cryo supply (George) 5 min | * Cryo supply (George) 5 min |
Revision as of 09:55, 17 April 2009
Meetings
2009 April 17, 10:00-11:00 F326
The agenda is not strict and should accommodate discussions
- General requirements for the GlueX target 10 min
- LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator)
- Beam power in LH2 < 100 uW (high luminocity)
- Hall B target adapted to Hall D: Hall D hydrogen target
- Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc)
- Solid targets (discussion)
- Cryo supply (George) 5 min
- General requirements to the PRIMEX target (Rory) 5 min
- Target group view (Chris) 10 min
- Providing specs - discussion