Line 13: Line 13:
  
 
** Fabricating prototype consisting of 5x5 PWO4 and 5x5 LG modules
 
** Fabricating prototype consisting of 5x5 PWO4 and 5x5 LG modules
** ECAL modules exist, have been testes using LED
+
** ECAL modules exist, have been testes using an LED
 
** LG modules will be instrumented with the resistive dividers (borrowed from Hall D)
 
** LG modules will be instrumented with the resistive dividers (borrowed from Hall D)
 
*** - all dividers were testes
 
*** - all dividers were testes

Revision as of 08:24, 4 April 2025

Connection

Meeting time and location:

Agenda

Detector checkout

Restoring PS test setup [1]

    • Fabricating prototype consisting of 5x5 PWO4 and 5x5 LG modules
    • ECAL modules exist, have been testes using an LED
    • LG modules will be instrumented with the resistive dividers (borrowed from Hall D)
      • - all dividers were testes
      • - modified PMT coupling to the LG block, use G10 tensioning plate to push the PMT towards the module
      • - testing LG PMTs (FEU-84)
    • The prototype will be places inside the CCAL box
      • modified the cooling plate to accommodate all modules

Monitoring

Calibrations