Difference between revisions of "JEF meeting, April 4, 2025"
From GlueXWiki
Line 13: | Line 13: | ||
** Fabricating prototype consisting of 5x5 PWO4 and 5x5 LG modules | ** Fabricating prototype consisting of 5x5 PWO4 and 5x5 LG modules | ||
− | ** ECAL modules exist, have been testes using LED | + | ** ECAL modules exist, have been testes using an LED |
** LG modules will be instrumented with the resistive dividers (borrowed from Hall D) | ** LG modules will be instrumented with the resistive dividers (borrowed from Hall D) | ||
*** - all dividers were testes | *** - all dividers were testes |
Revision as of 08:24, 4 April 2025
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Detector checkout
Restoring PS test setup [1]
- Fabricating prototype consisting of 5x5 PWO4 and 5x5 LG modules
- ECAL modules exist, have been testes using an LED
- LG modules will be instrumented with the resistive dividers (borrowed from Hall D)
- - all dividers were testes
- - modified PMT coupling to the LG block, use G10 tensioning plate to push the PMT towards the module
- - testing LG PMTs (FEU-84)
- The prototype will be places inside the CCAL box
- modified the cooling plate to accommodate all modules
Monitoring
Calibrations