Difference between revisions of "JEF meeting, April 11, 2025"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 6: Line 6:
  
 
= Agenda =
 
= Agenda =
** ECAL maintenance and performance
+
** ECAL maintenance and performance during the run
 
*** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
 
*** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
 
*** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
 
*** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
Line 12: Line 12:
 
**** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367]
 
**** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367]
 
*** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
 
*** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
 +
*** Issues with the readout crate during two first two production nights [https://logbooks.jlab.org/entry/4352046]
 
* Updates on current run
 
* Updates on current run
 
** Monitoring
 
** Monitoring
 
** Calibrations
 
** Calibrations
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]

Revision as of 11:27, 10 April 2025

Connection

Meeting time and location:

Agenda

    • ECAL maintenance and performance during the run
      • Issue with the FCAL HV module [1]
      • Flash ADC scalers during first beam [2]
      • Two modules fixed during the accelerator maintenance day [3]
        • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
      • Commissioning of the ECAL trigger [5] [6]
      • Issues with the readout crate during two first two production nights [7]
  • Updates on current run
    • Monitoring
    • Calibrations
  • Restoring PS test setup [8]