Difference between revisions of "JEF meeting, April 11, 2025"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 7: Line 7:
 
= Agenda =
 
= Agenda =
  
** ECAL maintenance and performance during the run
+
* ECAL maintenance and performance during the run
*** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
+
** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
*** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
+
** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
*** Two modules fixed during the accelerator maintenance day [https://logbooks.jlab.org/entry/4351422]
+
** Two modules fixed during the accelerator maintenance day [https://logbooks.jlab.org/entry/4351422]
**** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367]
+
*** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367]
*** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
+
** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
*** Issues with the readout crate during two first two production nights [https://logbooks.jlab.org/entry/4352046]
+
** Issues with the readout crate during two first two production nights [https://logbooks.jlab.org/entry/4352046]
** Monitoring
+
* Monitoring
** Calibrations
+
* Calibrations
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]

Revision as of 11:28, 10 April 2025

Connection

Meeting time and location:

Agenda

  • ECAL maintenance and performance during the run
    • Issue with the FCAL HV module [1]
    • Flash ADC scalers during first beam [2]
    • Two modules fixed during the accelerator maintenance day [3]
      • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
    • Commissioning of the ECAL trigger [5] [6]
    • Issues with the readout crate during two first two production nights [7]
  • Monitoring
  • Calibrations
  • Restoring PS test setup [8]