Difference between revisions of "JEF meeting, April 11, 2025"
From GlueXWiki
(→Agenda) |
m (→Agenda) |
||
Line 16: | Line 16: | ||
* Calibrations | * Calibrations | ||
** First look at Compton scattering events in the ECAL [https://logbooks.jlab.org/entry/4352034] | ** First look at Compton scattering events in the ECAL [https://logbooks.jlab.org/entry/4352034] | ||
+ | *** ECAL coverage with 2-arm Compton [https://userweb.jlab.org/~andrsmit/files/ECAL/04_11_2025/ecal_compton_coverage.pdf] | ||
* Monitoring | * Monitoring | ||
** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] | ** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] |
Revision as of 09:52, 11 April 2025
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- Issue with the FCAL HV module [1]
- Flash ADC scalers during first beam [2]
- Two modules fixed during the accelerator maintenance day [3]
- ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
- Commissioning of the ECAL trigger [5] [6]
- Issues with the readout crate during two first two production nights [7]
- Calibrations
- Monitoring
- ECAL/FCAL energy and timing [10]
- Restoring PS test setup [11]
- Assembling PS prototype [12]