Difference between revisions of "JEF meeting, April 18, 2025"
From GlueXWiki
Line 4: | Line 4: | ||
* ECAL maintenance and performance during the run | * ECAL maintenance and performance during the run | ||
+ | ** ECAL scalers before the accelerator maintenance day [https://logbooks.jlab.org/entry/4357287] | ||
+ | ** Checking ECAL modules [https://logbooks.jlab.org/entry/4358085] | ||
** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038] | ** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038] | ||
** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255] | ** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255] |
Revision as of 10:46, 18 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- ECAL maintenance and performance during the run
- ECAL scalers before the accelerator maintenance day [1]
- Checking ECAL modules [2]
- Issue with the FCAL HV module [3]
- Flash ADC scalers during first beam [4]
- Two modules fixed during the accelerator maintenance day [5]
- ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [6]
- Commissioning of the ECAL trigger [7] [8]
- Issues with the readout crate during two first two production nights [9]
- Calibrations
- Monitoring
- Restoring PS test setup [13]
- Assembling PS prototype [14]