* ECAL maintenance and performance during the run
 
* ECAL maintenance and performance during the run
 +
** ECAL scalers before the accelerator maintenance day [https://logbooks.jlab.org/entry/4357287]
 +
** Checking ECAL modules [https://logbooks.jlab.org/entry/4358085]
 
** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
 
** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
 
** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
 
** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]

Revision as of 10:46, 18 April 2025

Meeting time and location:

  • ECAL maintenance and performance during the run
    • ECAL scalers before the accelerator maintenance day [1]
    • Checking ECAL modules [2]
    • Issue with the FCAL HV module [3]
    • Flash ADC scalers during first beam [4]
    • Two modules fixed during the accelerator maintenance day [5]
      • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [6]
    • Commissioning of the ECAL trigger [7] [8]
    • Issues with the readout crate during two first two production nights [9]
  • Calibrations
    • First look at Compton scattering events in the ECAL [10]
    • ECAL/FCAL energy and timing [11]
    • ECAL coverage with 2-arm Compton [12]
  • Monitoring
  • Restoring PS test setup [13]
    • Assembling PS prototype [14]