Difference between revisions of "JEF meeting, April 18, 2025"
From GlueXWiki
Line 16: | Line 16: | ||
** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404] | ||
** ECAL coverage with 2-arm Compton [https://userweb.jlab.org/~andrsmit/files/ECAL/04_11_2025/ecal_compton_coverage.pdf] | ** ECAL coverage with 2-arm Compton [https://userweb.jlab.org/~andrsmit/files/ECAL/04_11_2025/ecal_compton_coverage.pdf] | ||
+ | ** Pi0 calibration [https://halldweb.jlab.org/primexd/ecal-cal/2025-01/] | ||
* Monitoring | * Monitoring | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | ||
** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] | ** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup] |
Revision as of 10:30, 21 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- ECAL maintenance and performance during the run
- ECAL scalers before the accelerator maintenance day [1]
- Checking ECAL modules [2]
- Issue with the FCAL HV module [3]
- Flash ADC scalers during first beam [4]
- Two modules fixed during the accelerator maintenance day [5]
- ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [6]
- Commissioning of the ECAL trigger [7] [8]
- Issues with the readout crate during two first two production nights [9]
- Calibrations
- Monitoring
- Restoring PS test setup [14]
- Assembling PS prototype [15]