Difference between revisions of "JEF meeting, April 25, 2025"
From GlueXWiki
m |
|||
Line 5: | Line 5: | ||
=Agenda= | =Agenda= | ||
* ECAL maintenance and performance during the run | * ECAL maintenance and performance during the run | ||
+ | ** HV module disconnected from the EPICS control | ||
+ | ** Bad flash ADC for reference PMTs | ||
+ | ** Low-level histograms [https://logbooks.jlab.org/entry/4362596] | ||
+ | ** | ||
* Calibrations | * Calibrations | ||
* Monitoring | * Monitoring | ||
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] | * Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg] |
Revision as of 08:47, 25 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information