Difference between revisions of "JEF meeting, April 25, 2025"
From GlueXWiki
(→Agenda) |
|||
Line 9: | Line 9: | ||
** Low-level histograms [https://logbooks.jlab.org/entry/4362596] | ** Low-level histograms [https://logbooks.jlab.org/entry/4362596] | ||
** Adjusting high voltages [https://logbooks.jlab.org/entry/4364644] | ** Adjusting high voltages [https://logbooks.jlab.org/entry/4364644] | ||
− | ** Recent ECAL occupancy [https://logbooks.jlab.org/entry/4364689]. Suspicious modules after the accelerator maintenance day | + | ** Recent ECAL occupancy [https://logbooks.jlab.org/entry/4364689] (production at 300 nA with 4x10^-4 X0 Al radiator). Suspicious modules after the accelerator maintenance day |
* Calibrations | * Calibrations | ||
** Initial setting of HVs using Compton scattering events | ** Initial setting of HVs using Compton scattering events |
Revision as of 08:57, 25 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- Calibrations
- Initial setting of HVs using Compton scattering events
- Pi0 calibration page [4]
- Monitoring
- Restoring PS test setup [5]
- The prototype has been assembled and tested. Ready for installing in Hall D
- Move it to the Hall on Wednesday next week (?)
- The prototype has been assembled and tested. Ready for installing in Hall D