Difference between revisions of "JEF meeting, April 25, 2025"
From GlueXWiki
(→Agenda) |
|||
Line 8: | Line 8: | ||
** Bad flash ADC for reference PMTs | ** Bad flash ADC for reference PMTs | ||
** Low-level histograms [https://logbooks.jlab.org/entry/4362596] | ** Low-level histograms [https://logbooks.jlab.org/entry/4362596] | ||
− | ** Adjusting high voltages [https://logbooks.jlab.org/entry/4364644] | + | ** Adjusting high voltages [https://logbooks.jlab.org/entry/4364644] (based on the run period 10, iteration 0) |
** Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [https://logbooks.jlab.org/entry/4364689]. Suspicious modules after the accelerator maintenance day | ** Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [https://logbooks.jlab.org/entry/4364689]. Suspicious modules after the accelerator maintenance day | ||
* Calibrations | * Calibrations |
Revision as of 09:03, 25 April 2025
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- ECAL maintenance and performance during the run
- HV module disconnected from the EPICS control
- Bad flash ADC for reference PMTs
- Low-level histograms [1]
- Adjusting high voltages [2] (based on the run period 10, iteration 0)
- Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [3]. Suspicious modules after the accelerator maintenance day
- Calibrations
- Monitoring
- Restoring PS test setup [6]
- The prototype has been assembled and tested. Ready for installing in Hall D
- Move it to the Hall on Wednesday next week (?)
- The prototype has been assembled and tested. Ready for installing in Hall D