Difference between revisions of "JEF meeting, April 25, 2025"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 11: Line 11:
 
*** iteration 5 (based on the run period 10, iteration 0) [https://logbooks.jlab.org/entry/4364644]
 
*** iteration 5 (based on the run period 10, iteration 0) [https://logbooks.jlab.org/entry/4364644]
 
** Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [https://logbooks.jlab.org/entry/4364689]. Suspicious modules after the accelerator maintenance day
 
** Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [https://logbooks.jlab.org/entry/4364689]. Suspicious modules after the accelerator maintenance day
 +
** '''Questions to address:'''
 +
*** Rates in the detector
 +
*** Gain stability
 
* Calibrations
 
* Calibrations
 
** Initial HV settings using Compton scattering events  [https://logbooks.jlab.org/entry/4357131]
 
** Initial HV settings using Compton scattering events  [https://logbooks.jlab.org/entry/4357131]

Latest revision as of 09:14, 25 April 2025

Meeting time and location:

Agenda

  • ECAL maintenance and performance during the run
    • HV module disconnected from the EPICS control
    • Bad flash ADC for reference PMTs
    • Low-level histograms [1]
    • Adjusting high voltages
      • iteration 5 (based on the run period 10, iteration 0) [2]
    • Recent ECAL occupancy, production at 300 nA with 4x10^-4 X0 Al radiator [3]. Suspicious modules after the accelerator maintenance day
    • Questions to address:
      • Rates in the detector
      • Gain stability
  • Calibrations
    • Initial HV settings using Compton scattering events [4]
    • Pi0 calibration page [5]
      • Pi0s are clearly seen for most ECAL modules (except in the innermost ring) after timing calibration.
  • Monitoring
  • Restoring PS test setup [6]
    • The prototype has been assembled and tested. Ready for installing in Hall D
      • Move it to the Hall on Wednesday next week (?)