Difference between revisions of "May 26, 2009 CDC Meeting"
From GlueXWiki
(→Connections) |
(→Notes from the previous meeting) |
||
Line 14: | Line 14: | ||
== Notes from the previous meeting == | == Notes from the previous meeting == | ||
+ | |||
+ | #1 Primex chamber gas velocity about 80 cm/s - curtis will relook at his numbers | ||
+ | #2 Should the wires be strung at JLAB so broken wires during transport are not an issue? Will need to find space for this at JLAB - timeframe Nov 2010. Would Gary come here for the rest of the assembly? Would students be brought down from CMU? | ||
+ | #3 Should there be some type of cleanroom used for CDC assembly? | ||
+ | #4 Gary found conductive rubber tubes .030-.050 in. diameter. Should be good for 1mm single diameter pin. | ||
+ | #5 Do we need a shoulder on the crimp pin? Is a counter bored hole adequate to stop the pin from going in too far and moving from wire tension? | ||
+ | #6 Gary found transit to accurately locate plates relative to each other within .003 inches. | ||
+ | #7 Curtis suggested using 2 inch rods for initial alignment of plates before gluing straws. | ||
+ | #8 Need to determine how much room is available on inner edge of endplates for tooling. Dous the gas plenum ever need to come off? | ||
== Agenda == | == Agenda == |
Revision as of 09:21, 21 May 2009
Meeting Time and Place
Tuesday May 26 2009 at 1:00pm At Jefferson Lab, the meeting will be held in room ??
Connections
To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")
Notes from the previous meeting
- 1 Primex chamber gas velocity about 80 cm/s - curtis will relook at his numbers
- 2 Should the wires be strung at JLAB so broken wires during transport are not an issue? Will need to find space for this at JLAB - timeframe Nov 2010. Would Gary come here for the rest of the assembly? Would students be brought down from CMU?
- 3 Should there be some type of cleanroom used for CDC assembly?
- 4 Gary found conductive rubber tubes .030-.050 in. diameter. Should be good for 1mm single diameter pin.
- 5 Do we need a shoulder on the crimp pin? Is a counter bored hole adequate to stop the pin from going in too far and moving from wire tension?
- 6 Gary found transit to accurately locate plates relative to each other within .003 inches.
- 7 Curtis suggested using 2 inch rods for initial alignment of plates before gluing straws.
- 8 Need to determine how much room is available on inner edge of endplates for tooling. Dous the gas plenum ever need to come off?
Agenda
- Assembly procedure
- Draft Procedure [Word File]
- Photos of Assmbly Hub for the CDC
- Gas flow into chamber (Gas Flow in the CDC)
- Lumina Straws/ Kapton vs Mylar CDC_Straw_Sag_photos
- Electrical Hookup of the CDC CDC_Electrical_Hook_Up_Photos
- Leak test on assembly
- Crimp pin design [[1]]
- AOT